Click to Home
HomeContact Us
Email PagePrint Page
Go To Search
Schultz Flood Mitigation Projects

LCDS April 2015

Spring 2015 is another busy season for flood mitigation in the Schultz Flood area. Several major projects are underway this spring to help further reduce the flooding threat to lives, public infrastructure, utilities and private property from annual monsoon rains that have significantly impacted this neighborhood since the 15,000-acre Schultz Fire and subsequent flooding in the summer of 2010. 

Following is information regarding some of the major projects that are underway or have been completed in the Schultz Flood area:       
                   

 2015 Flood Mitigation Projects
 South Paintbrush
EWP Project
Copeland Detention
Basin Project
 South Paintbrush EWP On Forest 05142015  Copeland Detention Basin
   
Lower Campbell Box Culverts Projects  
Lower Campbell Box Culverts Project  
   
2014 Flood Mitigation Accomplishments
 Upper Campbell
EWP Project
Paintbrush North
EWP Project
 Upper Campbell EWP Project Paintbrush North EWP Project 
   
Alice Crossing Project  
Alice Crossing Project   
   
2013 Flood Mitigation Accomplishments
Brandis Way EWP Project Wupatki Trails EWP Project
Brandis Way EWP Project Wupatki Trails EWP Project
   
Upper Campbell Stabilization Project Crisp Hill Crossing Project
Upper Campbell Stabilization Project Crisp Hill Crossing Project
   
Sunset Crater Estates Drainage Improvement Project  
Sunset Crater Estates Drainage Improvement Project  
   
2012 Flood Mitigation Accomplishments
Lower Campbell Ditch Repair Project Girls Ranch Road Berm Reconstruction Project
Lower Campbell Ditch Repair Project Girls Ranch Road Berm Reconstruction
   
Rodeo Drive Re-Profiling Project  
Rodeo Drive Reprofiling  

 


  • Sundays
  • 9:00 AM - 4:00 PM

  • Contact Us
    Flood Hotline
    (928) 679-8390

    Emergency Management
    (800) 559-9289
    (928) 679-8311

    Monday - Friday
    7 AM - 3:30 PM
    (928) 679-8311
    Connect With Us Online
    RSSFacebookTwitterYouTube