Lower Campbell Box Culverts Project
Henry Box Culvert 07082015
What's New...
7/31/15: The Lower Campbell Box Culverts Project is now complete.
 
Project Information  
The Lower Campbell Box Culverts Project upsized two existing box culverts -- one at Henry Drive and the other at the Chevron Station near Highway 89 -- on the south side of Campbell Avenue. The new, larger box culverts more efficiently accommodate the floodwater capacity of the Lower Campbell Drainage System that has been improved during the last three years to convey floodwater from Upper Campbell and North Paintbrush neighborhoods down to Highway 89 via the Lower Campbell Ditch.     
   
Construction Start: April 1, 2015
Status:  Project Completed
Project Cost: $900,000
Project Contractor:  Tiffany Construction Co.
Funding Entities:  County's Flood Control District   
   

Contact Us
Flood Hotline
(928) 679-8390

Emergency Management
(800) 559-9289
(928) 679-8311

Monday - Friday
7 AM - 3:30 PM
(928) 679-8311
Connect With Us Online
RSSFacebookTwitterYouTube