Three corridor meetings were held this spring to share the preliminary hydrology results of the post-Tunnel Fire flood modeling and other important post-wildfire flood risk information with property owners in the three affected Tunnel Fire corridors: 

  • Peaceful Way/Kevins Way Corridor Meeting: June 2 2022
  • Copeland Corridor Meeting: June 8 2022
  • Thames/Brandis Way Corridor Meeting: June 9 2022

The District’s flood area corridor meetings were held for those owners whose properties might be directly affected by post-Tunnel Fire flooding. With monsoon season now just a few weeks away, this allows the County Flood Control District Team to concentrate these efforts on the respective needs of each corridor.

Materials & recordings from each corridor are available in the list to the right. Please click on the maps below to view a larger version of the Flood Risk Assessment Maps.

Tunnel Fire Post Fire Flood Risk Assessment: 2-Inch Rainfall in 45 Minutes

Tunnel Fire 2-Inch Depth Map

Tunnel Fire Post Fire Flood Risk Assessment: 3-Inch Rainfall in 45 Minutes

Tunnel Fire 3-Inch Depth Map

Tunnel Fire Post Fire Flood Risk Assessment: 100-Year, 24-Hour Storm Event

Tunnel Fire 100Y24H Depth